All Products
-
Heavy steel forgings
-
Open die forging
-
Alloy steel forgings
-
Ring flange, rolling ring
-
Forged steel shaft
-
Gear forging, gear ring
-
Forged cylinder, cylinder forging
-
Carbon steel forgings
-
Stainless steel forgings
-
Crankshaft forging, forged crankshaft
-
Roller forging, forged roller
-
Forged spindle, turbine spindle
-
Marine rudder, forging for marine
-
Steam turbine rotor forging
-
Tube sheets
-
Machined parts
-
Rotor
-
Gear rack
-
close die forging
-
Olaf kyrre monradI am sure that all customer so meet her will be very satisfied with her good service.
Cylinder Cap Carbon Steel Forgings Rough Machining , 20MnMoNb Alloy Steel Tube Sheet Plate
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
4340 EN26 Alloy Steel / Carbon Steel Forgings Custom OEM For Pressure Equipment
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
DIN open die forging Alloy Steel Tube Sheet Plate, boiler tube sheet, Disc ,tube sheet
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
ASTM 1045 DIN CK45 Forged Cylinder barrel forging carbon steel , EF + LF + VD
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
304L 316 stainless steel Pipe Part Forged Cylinder Sleeve Forging For Chemical Industry
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
EN 40CrNiMo Alloy Steel Forged Cylinder 100 ton , Rough Machined Pipe Forging
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Open Die Carbon Steel Hydraulic Cylinder Forging / Oil Pipe Forging Heat Treatment
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Custom Forged Cylinder Piston EN DIN , Stainless Steel Cylinder Seat For Railroad Bridge
| Packaging Details: | Fumigation-free wood package or steel package |
|---|---|
| Delivery Time: | 40 days or as per the actual inquiry |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Mining Machinery Gear Racks Gear Forging Finishing Machining , gear guides, rack
| Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
|---|---|
| Delivery Time: | 30 days or as per the exact product |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Wind power gear, ring gear, ring gear, growth ring, ring gear, ring gear carburizing
| Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
|---|---|
| Delivery Time: | 30 days or as per the exact product |
| Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |


