All Products
-
Heavy steel forgings
-
Open die forging
-
Alloy steel forgings
-
Ring flange, rolling ring
-
Forged steel shaft
-
Gear forging, gear ring
-
Forged cylinder, cylinder forging
-
Carbon steel forgings
-
Stainless steel forgings
-
Crankshaft forging, forged crankshaft
-
Roller forging, forged roller
-
Forged spindle, turbine spindle
-
Marine rudder, forging for marine
-
Steam turbine rotor forging
-
Tube sheets
-
Machined parts
-
Rotor
-
Gear rack
-
Olaf kyrre monradI am sure that all customer so meet her will be very satisfied with her good service.
Mining shaft, main shaft, Drive shaft, transmission shaft, steel shaft, shaft forging
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Mining machinery gear guides, gear transmission, rack, gear rack with carbon alloy steel
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
ASTM A388 Stainless Steel Open Die Forging Precision Rotating Gears Forged , EF + LF + VD
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Open die forging, carbon, alloy steel shaft, forged shaft; mining machinery shaft forging
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Drive gear, gear ring, gear box, gear forging, pinion, wheel gear with carbon alloy steel
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
1