All Products
-
Heavy steel forgings
-
Open die forging
-
Alloy steel forgings
-
Ring flange, rolling ring
-
Forged steel shaft
-
Gear forging, gear ring
-
Forged cylinder, cylinder forging
-
Carbon steel forgings
-
Stainless steel forgings
-
Crankshaft forging, forged crankshaft
-
Roller forging, forged roller
-
Forged spindle, turbine spindle
-
Marine rudder, forging for marine
-
Steam turbine rotor forging
-
Tube sheets
-
Machined parts
-
Olaf kyrre monradI am sure that all customer so meet her will be very satisfied with her good service.
Contact Person :
Jennifer
Phone Number :
+86 137 0152 5121
WhatsApp :
+8613701525121
Mining shaft, main shaft, Drive shaft, transmission shaft, steel shaft, shaft forging
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Mining machinery gear guides, gear transmission, rack, gear rack with carbon alloy steel
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
ASTM A388 Stainless Steel Open Die Forging Precision Rotating Gears Forged , EF + LF + VD
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Open die forging, carbon, alloy steel shaft, forged shaft; mining machinery shaft forging
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
Drive gear, gear ring, gear box, gear forging, pinion, wheel gear with carbon alloy steel
Packaging Details: | Individual plastic wrapping, fumigation-free wooden pallet or steel shelf. All wood to fumigated in |
---|---|
Delivery Time: | 30 days or as per the exact product |
Payment Terms: | 30% prepayment by T/T, the balance against the receipt of the correct test certificates or as per cu |
1